Contract: $99,211 - U.S. Army Corps of Engineers, except civil program financing - Sep. 29, 2009
No votes have been cast for this award yet
Award Description: INSTALLATION OF @1,000 l/f of shoreline proection/fish habitat at 3 different locations on the Raystown Lake Project. Stablization of shorelines within 2 designated campgrounds using PFGC wave deflector/ fish habitat systems.
Project Description: No pre-work conferences set to date.
Jobs Summary: Retained 2 heavy equipment operators, 2 truck drivers, and a laborer (Total jobs reported: 5)
Project Status: Not Started
This award's data was last updated on Sep. 29, 2009. Help expand these official descriptions using the wiki below.