HUNTINGTON, UT

HUNTINGTON CLEVELAND IRRIGATION COMPANY

Grant: $2,902,538 - Department of the Interior - Sep. 30, 2009

Are you satisfied with this award? or

No votes have been cast for this award yet

Join the conversation: Post a comment about this award


Award Description: HUNTINGTON CLEVELAND SALINITY REDUCTION PROJECT - Abandon 9.1 miles of canal and eliminate winter water in 20.1 miles of canal by constructing 5.1 miles of 30 and 60 inch pipe, a new river diversion, pressure reducing stations and connecting to existing regulating ponds.

Project Description: Design engineering is approximatley 75% complete. Meetings have been held with affected agencies. Approximately 75% of required property and easements have been obtained.

Infrastructure Description: The construction will create temporary and permanent jobs

Jobs Summary: Engineering jobs created for the duration of design and construction. Constuction jobs created for the duration of construction. Agricultural water maintenance job maintained with this construction. (Total jobs reported: 4)

Project Status: Less Than 50% Completed

This award's data was last updated on Sep. 30, 2009. Help expand these official descriptions using the wiki below.


Funds Recipient

HUNTINGTON CLEVELAND IRRIGATION COMPANY
HUNTINGTON, UT 84528
See more awards to this recipient

Place of Performance

Huntington, UT 84528
See more awards in this zip code



Wiki Description

No comments have been added for this project.

Edit the Wiki Description (editing policy)


Post a comment