Contract: $321,566 - Public Buildings Service - May. 20, 2009
No votes have been cast for this award yet
Award Description: A/E Services under ARRA for Thomas F. Eagleton Courthouse High Performance Green Bldg. - Lighting improvement: A high-performance lighting replacement project will both decrease energy consumption and cost, and improve working conditions and productivity for building occupants. The project will include the following: Highly efficient overhead lighting fixtures; lower overhead lighting intensity supplemented with task lighting to create better lighting levels at the work surface; Dimming fluorescent ballasts for all perimeter areas with windows, so that lights will dim as incoming daylight supplies more of the required light level, and occupancy sensors throughout; LED lighting in some special applications, such as parking garages, fire exit signage; Stairwell lighting with new sensors and reduced 24/7 requirements; More user controls; Central on-off lighting control through the building energy management control system. Building Systems/Tune up: This includes the installation of high performance HVAC components in buildings which will both decrease energy consumption and operational cost. This project will include some or all of the following: New advanced metering; Total building re-commissioning/retro-commissioning; Upgrade energy management & control system (EMCS); New 45 & 75 KVA low voltage transformers w/harmonic mitigation; Upgrade elevator equipment room HVAC units. Other building enclosure/envelope improvements: To reduce air infiltration.
Project Description: Activity to date: Air/Infiltration Reduction Design - 100%; Lighting Improvement Design 40%; Building System/Tune Up Design 30%
Jobs Summary: Retained: Architectural, electrical/hvac engineers and administrative services. (Total jobs reported: 2)
Project Status: More than 50% Completed
This award's data was last updated on May. 20, 2009. Help expand these official descriptions using the wiki below.
Funds from this award have been disbursed to subcontractors. Click here to see a list of subcontractors.
| Recipient | Amount | City | State |
|---|---|---|---|
| Ibrahim Engineering Corp | $1,748 | SAINT LOUIS | MO |
| EDM Incorporated | $215,432 | SAINT LOUIS | MO |