Contract: $222,926 - Federal Highway Administration - Sep. 22, 2009
No votes have been cast for this award yet
Award Description: The proposed bridge replacements consist of total replacements of the existing deficient bridges consistent with AASHTO and WFLHD design and safety standards. Replace the existing bridges with modular superstructure systems founded on concrete sill abutments with backwalls. The new structures will generally be along the existing road; although minor horizontal and vertical alignment may be needed to provide a more uniform driving experience and safe travel speeds.
Project Description: This project is just beginning and we are in the process of coordinating field work efforts with our subconsultants, the USFS and WFLHD. No invoices have been submitted at this time.
Jobs Summary: The Recovery Act Funds have helped us retain 2 positions under this contract that include an hydraulics engineer and a bridge engineer. (Total jobs reported: 2)
Project Status: Less Than 50% Completed
This award's data was last updated on Sep. 22, 2009. Help expand these official descriptions using the wiki below.
Funds from this award have been disbursed to subcontractors. Click here to see a list of subcontractors.