BAY MINETTE, AL

CSX TRANSPORTATION, INC.

Contract: $67,709,349 - U.S. Coast Guard - Aug. 20, 2009

Are you satisfied with this award? or

67% voted satisfied - 33% voted not satisfied - 3 vote(s) cast

Yes
No

Join the conversation: Post a comment about this award


Award Description: Note that this is not a federally awarded contract, grant, or loan; thus the above reporting information section is not applicable to this report. The recovery funds reported herein are a reimbursement of the federal share of the expenses accrued by CSX Transportation (CSXT) for altering CSXT's Bridge over the Mobile River near Hurricane, AL under the provisions of the Truman-Hobbs Act. The existing bridge was declared by the Coast Guard to be an unreasonable obstruction to navigation. The Coast Guard issued an Order to Alter to CSXT requiring CSXT to replace the swing span of the existing bridge with a new lift span that provides for a wider navigation opening which is necessary to allow navigation through and under the bridge reasonably free and unobstructed. The alteration of the draw span is to be conducted by CSXT personnel and through contracts between CSXT and contractors / consultants. All construction activities, expenditures, and contracts executed under this project are monitored by the Coast Guard. The project received $14,614,808 through the ARRA Act of 2009 that leveraged $53,094,541 of previously obligated funds appropriated to the project and created a $67,709,349 (amount of award) stimulative impact on the construction industry. Prior to receiving the recovery funds, $3,500,000 was spent from the previously obligated funds to complete the design of the bridge and install commercial electrical power to the bridge site.

Project Description: Contractor: Mobilization, Shop Drawing production, Field Office Setup, Mitigating Utility Conflicts at Bridge Site. Engineer: Project Management, Review of RFIs and Shop Drawings Owner: Order materials for signal system changes.

Jobs Summary: Unskilled Laborer, Welder, Carpenter Helper, Crane Operator, Carpenter, Mechanic, Form Setter, Office Assistant (Total jobs reported: 20)

Project Status: Less Than 50% Completed

This award's data was last updated on Aug. 20, 2009. Help expand these official descriptions using the wiki below.


Funds Recipient

CSX TRANSPORTATION, INC.
JACKSONVILLE, FL 32202
See more awards to this recipient

Place of Performance

Hurricane, AL 36507
See more awards in this zip code

Funds from this award have been disbursed to subcontractors. Click here to see a list of subcontractors.




Wiki Description

No comments have been added for this project.

Edit the Wiki Description (editing policy)


Post a comment