Contract: $5,923,695 - Department of the Army - Sep. 11, 2009
0% voted satisfied - 100% voted not satisfied - 2 vote(s) cast
Award Description: Provide all plant, labor, equipment, materials, design, engineering, and incidentals necessary to accomplish the following: Repair/Upgrade the Peterson Installation Control Center in Bldg. 845. Design and Construct the renovation of the existing Command Post area in Bldg. 845. Design and Construct the renovation of two sets of Men's and Women's restrooms in Bldg. 845. Design and Construct the complete replacement of the HVAC system in Bldg. 1376. Design and Construct for repair facility by reconfiguration of interior walls, compete interior finishes replacement, restroom repair, repair electrical, life-safety, fire detection and protection, and incidental changes in Bldg. 1376. Design and Construct the repair of exiting landscaping and parking lots to meet anti-terrorism/force protection in Bldg. 1376. Design and Construct mechanical room addition in Bldg. 1376. Design and Construct for replacement of existing condenser with new condensing units, to include new DDC controls. Provide new airflows to classrooms on the first and second floor. Test, adjust and balance both multi-zone Air Handling Units in Bldg. 1141. Design and Construct for the renovation of two sets of Men's and Women's restrooms in Bldg. 1141. Renovate the classrooms and offices in Bldg. 1141. Replace with new, six hydronic unit heaters, thermostats/controls, and pipe insulation in Bldg. 640. Design and Construct for replacement of HVAC system with new to include two new gas fired, direct exchange rooftop units, new controls, ductwork connections; test, adjust, and balance the entire system in Bldg. 504.
Project Description: This project was awarded on 09/11/2009. Through the end of September, the design of this project was started.
Jobs Summary: As the prime contractor on this project, this job has created or retained 3.5 full time positions as of 09/30/2009. The positions created are one full time project manager, one full time superintendent, one full time quality control manager, and one part time contract administrator. We aniticipate the creation of more jobs as the design and construction of this project progress. (Total jobs reported: 4)
Project Status: Less Than 50% Completed
This award's data was last updated on Sep. 11, 2009. Help expand these official descriptions using the wiki below.