Contract: $126,453 - Public Buildings Service - Apr. 30, 2009
No votes have been cast for this award yet
Award Description: Purpose is to investigate and provide recommendations for optimizing building performance through identifying energy improvements and demand reduction strategies. A feasibility study is being generated to include the following information: 1) The integration of geothermal heat pumps in the facility to offset the cost of cooling and heating the building. 2) Determine the feasibility of installing PV panels on the roof. 3) Provide suggestions for the most methods of retrofitting the roof to accept PV panels where existing roof can not supoort PV panel installation. 4) Provide conceptual renderings and drawings depicting vehicle canopies and covered walkways that use PV panels as protection from weather. 5) Provide any other suggestions for reducing the electrical load of the building. 6) Provide a fully developed Lifecycle costing, pay back period, and energy savings.
Project Description: Provided a 466 page draft study on retro-commissioning the facility. The study included a Structural Analysis, Photovoltaic Analysis, and Geothermal System Analysis.
Jobs Summary: Retain positions: Electrical Engineer, Mechanical Engineers, Structural Engineers, Architects, CAD Technicians, Well Driller, Driller Helper, Grouter, and Administrative workers. (Total jobs reported: 2)
Project Status: More than 50% Completed
This award's data was last updated on Apr. 30, 2009. Help expand these official descriptions using the wiki below.
Funds from this award have been disbursed to subcontractors. Click here to see a list of subcontractors.
No comments have been added for this project.