Contract: $1,070,000 - U.S. Army Corps of Engineers - civil program financing only - Aug. 5, 2009
No votes have been cast for this award yet
Award Description: Bank Stabilization and Erosion Control at St. Stephens Powerhouse, St. Stephens, SC
Project Description: Preliminary Preparations and surveying. Area used Plan, Construction schedule, Drawings and Calulations. Environmental Protection Plan, Quality Control Plan, Health & Safety Plan, Hurricane Plan, Activity Hazard Analysis, Quarry Graduation. Cutting grass around bridges at hwy 45 and 35. Installed 6 new posts with concrete, four corner posts and two gate posts. Installed a 8' fence and two gates.Place bared wire at top of 8' fence. Expenses to date: $124,655.62.
Jobs Summary: Surveyors, Engineers, Construction Workers, Construction Management, Contract Administrators, Truck Drivers, Quarry Workers (Total jobs reported: 16)
Project Status: Less Than 50% Completed
This award's data was last updated on Aug. 5, 2009. Help expand these official descriptions using the wiki below.
No comments have been added for this project.