RAVENSDALE, WA

NICHOLSON CONSTRUCTION COMPANY

Contract: $8,445,000 - Department of the Army - Jul. 6, 2009

Are you satisfied with this award? or

No votes have been cast for this award yet

Join the conversation: Post a comment about this award


Award Description: The main component of work is the installation of a 450-foot long double line grout curtain into the right abutment. The grout curtain varies from 90 feet to 170 feet in depth below elevation 1206 feet. The grout curtain will extend fifteen feet in to bedrock for the first 170 feet and in to a silt horizon for the remainder of the curtain length. The grout curtain will be comprised of high and low mobility, balanced, stable grouts. Real-time collection of water pressure testing and grouting responses will be required as will near real-time adjustments to grout mixes.

Project Description: The main component of work is the installation of a 450-foot long double line grout curtain into the right abutment. The grout curtain varies from 90 feet to 170 feet in depth below elevation 1206 feet. The grout curtain will extend fifteen feet in to bedrock for the first 170 feet and in to a silt horizon for the remainder of the curtain length. The grout curtain will be comprised of high and low mobility, balanced, stable grouts. Real-time collection of water pressure testing and grouting responses will be required as will near real-time adjustments to grout mixes.

Jobs Summary: Civil Engineers, Equipment Operators, Geologists, (Total jobs reported: 35)

Project Status: More than 50% Completed

This award's data was last updated on Jul. 6, 2009. Help expand these official descriptions using the wiki below.


Funds Recipient

NICHOLSON CONSTRUCTION COMPANY
CUDDY, PA 15031
See more awards to this recipient

Place of Performance

Ravensdale, WA 98051
See more awards in this zip code



Wiki Description

No comments have been added for this project.

Edit the Wiki Description (editing policy)


Post a comment