ATLANTA, GA

TOLAND & MIZELL ARCHITECTS/APPLIED ENGINEERING SOLUTIONS - JOINT VENTURE

Contract: $50,984 - Department of the Army - Sep. 21, 2009

Are you satisfied with this award? or

No votes have been cast for this award yet

Join the conversation: Post a comment about this award


Award Description: Design of Repair Radiology Clinic Air Handling Units Madigan Army Medical Center, Bldg. 9040, Ft. Lewis, WA Repair of the PACS Computer Room HVAC system. This work consists of providing a design work plan to modify the HVAC system serving the PAC Computer Room. Design will include removal of the two existing spot cooler units and installation of replacement units. Calculated cooling load of both existing and future computer equipment shall be used to determine the capacity of the new spot coolers. These coolers shall include humidifiers and provide for PACS Computer Room humidification control. Electrical power for the spot cooler shall be feed from an Equipment Critical MCC. Spot coolers shall be arranged in the PACS Computer Room to provide consistent even cooling without hot spots to all areas of the raised floor supply air plenum and effectively direct warmed room air back to spot cooler return air intakes. Spot coolers shall be redundant to assure continuous air conditioning is provided to the room in the event to a failure to the primary spot cooler unit. The PACS computer room spot coolers shall be capable of operation using chiller water from the auxiliary chiller (EWCU#7) or the central air conditioning unit. Design for the installation of the (1) return air grille in each of the 2 office spaces (room 1-48-11, 1-48-12) connecting the grills to the AHU-40 return air system, to restore proper room air change rates to theses room.

Project Description: Preparation for Site Survery.

Jobs Summary: The TM/AES Joint Venture is comprised of 2 independent firms represented by 2 Principals. The TM/AES Joint Venture has no employees. The work received by the Joint Venture is then contracted to the two firms and various other subcontractors. The work for this Deliver Order required the following disciplines: Mechanical and Electrical however based on the scope of this Delivery Order it was able to help retain only 1 existing position. (Total jobs reported: 1)

Project Status: Less Than 50% Completed

This award's data was last updated on Sep. 21, 2009. Help expand these official descriptions using the wiki below.


Funds Recipient

TOLAND & MIZELL ARCHITECTS/APPLIED ENGINEERING SOLUTIONS - JOINT VENTURE
ATL, GA 30318
See more awards to this recipient

Place of Performance

590 Means Street NW, Suite 200
Atlanta, GA 30318
See more awards in this zip code

Funds from this award have been disbursed to subcontractors. Click here to see a list of subcontractors.




Wiki Description

No comments have been added for this project.

Edit the Wiki Description (editing policy)


Post a comment