Award Description: Replacement of the existing dock systems at Smith, Brush and Sinclair Lakes with new commercially supplied low maintenance dock systems. Project is located on the Bonners Ferry Ranger District of the Idaho Panhandle National Forests. Consultant will develop design alternatives, perliminary design and a final design to include a final set of contract drawings with cover sheet, summary of estimated quantities sheet, general notes, pictures of existing structure to be removed, design and construction details for the new shoreline fixed piers, gangways and floating dock systems and any miscellaneous details associated with the project. PS&E package will include special project specifications and be tailored for contractors to bid over winter without access to the lake sites.

Project Description: Completed site surveys and working on preliminary designs.

Jobs Summary: The Recovery Act Funds have helped us maintain 2 positions under this contract that includes an engineering designer and cadd operator. (Total jobs reported: 2)

Project Status: Less Than 50% Completed

This award's data was last updated on Aug. 10, 2009. Help expand these official descriptions using the wiki below.


Funds Recipient

D J & A PC
EAST MISSOULA, MT 59801
See more awards to this recipient

Place of Performance

3203 Russell St
Missoula, MT 59801
See more awards in this zip code



Wiki Description

No comments have been added for this project.

Edit the Wiki Description (editing policy)


Post a comment