SAINT LOUIS, MO

JACOBS ENGINEERING GROUP INC.

Contract: $45,149 - Public Buildings Service - Jul. 29, 2009

Are you satisfied with this award? or

0% voted satisfied - 100% voted not satisfied - 1 vote(s) cast

Yes
No

Join the conversation: Post a comment about this award


Award Description: Construction Management Services for the Sanitary and Storm Sewer Project at the Goodfellow complex.Provide CM services for the Design Phase. Services shall include but are not limited the following: Attending the 35%, 65%, and 95% Design Review meetings; review drawings and specifications at 35%, 65%, and 95% Design; attend three (3) additional Design Development meetings; evaluate construction cost estimate and attend three (3) reconciliation meetings with A/E and CMc. Goodfellow Sanitary and Storm Sewer Project - the sanitary and storm system is to be separated and reconstructed to meet local MSD sewer drainage regulations. Underground detention facilities are to be built to hold the storm runoff on site. Improvements will be made to the exterior features of the building, such as the breezeways, sidewalks, stoops, and ramps. The project is to take place in phases in order to cause minimum disruption to the tenants of the facilities.The work on the project includes, but is not limited to, pavement and sidewalk removal, excavation, storm sewer pipe installation, reconstruction of the sanitary sewer line, construction of storm water detention cells, construction of storm manholes, storm inlets, junction boxes, and grate inlet conversions, repaving, landscaping, sprinkler system installation, utility relocation, structure demolition and breezeway construction.

Project Description: Project Kickoff Meeting for Design Services held; GSA defining A/E SOW; A/E submitted SOW document; A/E submitted revised SOW document;GSA awarded CMa contract; CMa project initiation was set up during this quarter.

Jobs Summary: Retained existing personnel including Project Controls; Contract Manager; Project Manager; Quality Control Superintendent; Civil Engineers during this quarter. (Total jobs reported: 0)

Project Status: Less Than 50% Completed

This award's data was last updated on Jul. 29, 2009. Help expand these official descriptions using the wiki below.


Funds Recipient

JACOBS ENGINEERING GROUP INC.
SAINT LOUIS, MO 63102
See more awards to this recipient

Place of Performance

St Louis, MO 63120
See more awards in this zip code



Wiki Description

No comments have been added for this project.

Edit the Wiki Description (editing policy)


Post a comment