OMAHA, NE

ALLEY POYNER MACCHIETTO ARCHITECTURE, P.C.

Contract: $20,811 - Public Buildings Service - Jun. 30, 2009

Are you satisfied with this award? or

50% voted satisfied - 50% voted not satisfied - 2 vote(s) cast

Yes
No

Join the conversation: Post a comment about this award


Award Description: Pre-Design to install roof photovoltaic system.

Project Description: as of 09/30/2009 The pre-design report for the ARRA Photovoltaic Roof System at the Edward Zorinsky Federal Building was completed on August 21st, 2009. The report included work from Architectural, Mechanical, Electrical, and Structural disciplines. The report included existing conditions, design considerations, recommendations, market conditions and opinions of probable cost and life cycle analysis. The GSA is currently reviewing the report to determine if the project should proceed forward.

Jobs Summary: Architectural coordination with Mechanical and Electrical and Structural Engineering consultants for Pre-design services. (Total jobs reported: 1)

Project Status: More than 50% Completed

This award's data was last updated on Jun. 30, 2009. Help expand these official descriptions using the wiki below.


Funds Recipient

ALLEY POYNER MACCHIETTO ARCHITECTURE, P.C.
OMAHA, NE 68102
See more awards to this recipient

Place of Performance

OMAHA, NE 68102
See more awards in this zip code

Funds from this award have been disbursed to subcontractors. Click here to see a list of subcontractors.