Contract: $3,965,215 - Public Buildings Service - May. 5, 2009
25% voted satisfied - 75% voted not satisfied - 4 vote(s) cast
Award Description: Provide architectural and engineering services for ARRA energy and water conservation measures. Work includes meetings, site visits, calculations, reports, drawings and construction estimates. Provide art conservator services for existing wall mural including conservator self employment and insurance costs. Work includes meetings, site visits, sampling, drawings and periodic reporting. Provide ACM sampling of existing drywall joint compound within the Social Security Administration space as well as select other locations within the building. Work includes meetings, site visits, sampling and report. Provide ACM sampling of existing drywall joint compound within the Veterans Affairs space as well as select other locations within the building. Work includes meetings, site visits, sampling and report.
Project Description: Attended meetings, provided site visits, completed sampling, developed drawings and findings, provided drawings and reported findings. Attended meetings, provided site visits, collected samples, developed findings and issued the report. Attended meetings, provided site visits, collected samples and developed findings.
Jobs Summary: Not applicable for this period. (Total jobs reported: 0)
Project Status: More than 50% Completed
This award's data was last updated on May. 5, 2009. Help expand these official descriptions using the wiki below.
No comments have been added for this project.