Contract: $27,445 - Public Buildings Service - Jul. 24, 2009
No votes have been cast for this award yet
Award Description: The objective of this work order is to achieve the re-commissioning and retro-commissioning goals set forth in the ARRA for the Howard M. Metzenbaum USCH by creating bid and construction documents that describe all construction phase project work required by the NRPC identified projects and support the NRPC with project identification and definition. The design shall consist of but is not limited to the following: Mechanical Systems Upgrade/Replacement: Chillers, cooling towers, air conditioning units, boilers, hot water converters, steam pressure reducing stations, condensate return systems, primary and secondary pumping systems, domestic hot water heaters, heat exchangers, air handling units, terminal or variable air volume (VAV) boxes, heat recovery units, motors, steam traps, dampers, pumps and air ducts. Energy conservation and renewable energy projects • Water conservation, plumbing fixtures, cooling tower makeup water and drain. • Lighting System Upgrade/Replacement: Re-lamping, occupancy sensors, automated lighting controls, daylight controls installation, replacement and re-wiring. • Building automation/control systems upgrade/replacement: Includes system programming/sequence of operations, drives and sensors. • Building envelope: upgrade/replace roof (green roof, integrated photovoltaic roof membrane, cool roof (achieve maximum R-value for climactic zone), windows, doors, above and below grade wall assemblies, to achieve specified R-value, etc. • Analysis and design of an advanced metering system for electricity only as mandated by the Energy Policy Act of 2005. • Review and implementation of all pertinent energy and water conservation items as shown in Energy and Water Conservation Audit. • Analysis and design of modifications to the existing primary and secondary chilled water system to result in energy and system operating cost savings. • Analysis and determination of the building BAS/ EMS systems, with identification and design of projects that maximize opportunities to save energy and operating cost through system upgrades and partial or full replacement. Includes system programming / sequence of operations and drives and sensors. Design Development Phase 1. Design Development drawings and specifications detailing retro¬commissioning and re-commissioning work, and ECM projects to 30% construction document completion. 2. Design Development phase cost estimate deliverable shall be in the form of a detailed written review of the preliminary cost, energy savings, and payback estimates completed by the NRPC / NCMC as part of the 25% submittal under that contract SOW. A/E shall indicate concurrence, non-concurrence, or provide additional information as may be required by GSA. Construction Document Phase Submission 75% Submission Construction Document Submission 1. Code Analysis. 2. Construction drawings and written edited specifications of 75% completion. 3. Updated construction cost estimate. 90% Submission Construction Documents Submission 1. Construction drawings and written edited specifications of 90% completion. 2. Updated construction cost estimate. 100% Submission Construction Documents Submission 1. Construction drawings and written edited specifications of 100% completion. Construction documents 100% ready to release for bid, including incorporation of all previous review comments. 2. Final construction cost estimate.
Project Description: None at this time
Jobs Summary: None at this time (Total jobs reported: 0)
Project Status: Not Started
This award's data was last updated on Jul. 24, 2009. Help expand these official descriptions using the wiki below.
No comments have been added for this project.