Contract: $8,333,334 - National Aeronautics and Space Administration - Aug. 31, 2009
43% voted satisfied - 57% voted not satisfied - 7 vote(s) cast
Award Description: Recovery - Mobile Launcher Element (MLE) Electrical Design (CLIN 009) The Mobile Launcher (ML) is a large platform with a tower used to transport, service, and launch the next generation launch vehicle and spacecraft (Ares I and Orion). This expenditure is to design the specialized electrical ML systems and equipment which are a critical part of the overall ML structure. These systems and equipment will fuel and service the launch vehicle and spacecraft systems. The application of funds for these purposes would increase the number of jobs, particularly in engineering, analysis, design, and development.
Project Description: Submitted 60% Design review products for Kennedy Complex Control Set (KCCS) design. Submitted 30% Design review products for Environmental Control System (ECS) design.
Jobs Summary: Jobs Retained - Electrical Engineers / Engineering Designers / Project Managers / Project Administrators. The company was able to retain current employees. (Total jobs reported: 54)
Project Status: Less Than 50% Completed
This award's data was last updated on Aug. 31, 2009. Help expand these official descriptions using the wiki below.
No comments have been added for this project.