Contract: $201,224 - Department of the Air Force - Apr. 25, 2009
No votes have been cast for this award yet
Award Description: Power wash and overcoat exterior coating system. Power tool clean and specific rust and delaminating coating using vacuum assist power tools. Apply rust inhibited epoxy mastic primer to bear steel from above cleaning. Power wash (3,000 psi) all exterior surfaces to loose paint and chalking of old coating. Apply carboline rust bond epoxy tie coat to all cleaned and prepared surfaces. Apply Carboline series 134 HG, high gloss top coat to all primed surfaces as recommended by manufacturer. Reapply existing logo. Replace existing bar safety climb with new industry standard cable climb.
Project Description: The water tower has been power washed and is currently being prepared for painting.
Jobs Summary: There were 2 jobs retained by the award of this contract. Although the project was subcontracted out, the project required for supervising and implementing safety requirements on behalf of JAMCO. (Total jobs reported: 2)
Project Status: Less Than 50% Completed
This award's data was last updated on Apr. 25, 2009. Help expand these official descriptions using the wiki below.
Funds from this award have been disbursed to subcontractors. Click here to see a list of subcontractors.
No comments have been added for this project.