Grant: $35,526,290 - Federal Highway Administration - Sep. 19, 2009
75% voted satisfied - 25% voted not satisfied - 8 vote(s) cast
Award Description: BOSTON- CAMBRIDGE- NORTH BANK BRIDGE CONSTRUCTION, B-16-302=C-01-028, RIVERWALK OVER CHARLES RIVER & MBTA MassHighway proposes to construct the North Bank Bridge over the MBTA Commuter Rail tracks providing a bicycle/pedestrian connection from East Cambridge to City Square Charlestown and the Boston Harbor Waterfront. Walkway connections will be constructed from the Bridge linking North Point Park, the future Charles River Conservancy Skatepark, and Paul Revere Park. A Multi-Use Path connection will be provided to the recently constructed Cambridge Multi-Use Trail. The project connects the North Point Park and Paul Revere Park Charles River Esplanade walks.
Project Description: This project has been advertised the contract has not yet been awarded.
Jobs Summary: Jobs associated with this project are typical to the road construction industry and include skilled and unskilled laborers, masters in the building trades, apprentices and trainees, road flaggers, equipment operators and truck drivers. (Total jobs reported: 0)
Project Status: Less Than 50% Completed
This award's data was last updated on Sep. 19, 2009. Help expand these official descriptions using the wiki below.
No comments have been added for this project.