| Contract |
Repair Shower/Finishes Dorm772 |
$441,810 |
Little Rock Air Force Base |
AR |
0 |
-1 |
| Contract |
Repair Roof Seals, B/1115. Removed metal soffit on the outside of the facility, injected a low expansion foam material to… |
$35,162 |
Mcconnell Afb |
KS |
0 |
0 |
| Contract |
Repair building 1127 for SOAR. Abate asbestos from building, install new exit lights and pull stations at each exit, install… |
$670,079 |
Mcconnell Afb |
KS |
8 |
0 |
| Contract |
Install ground source heat pumps,the principal items of work include, but no limited to demolishing existing HVAC system at bldg… |
$82,462 |
Mcconnell Afb |
KS |
9 |
-1 |
| Contract |
Repair Airfield Spalls & Joints. Airfield Spall & Joint Seal Repair JFSD 200821 at Grand Forks AFB ND |
$999,997 |
Grand Forks Afb |
ND |
10 |
0 |