| Contract |
SBIR Phase II |
$330,000 |
La Puente |
CA |
0 |
0 |
| Grant |
ARRA Administrative Supplement to FA9453-08-2-0228 |
$649,862 |
Tempe |
AZ |
0 |
-1 |
| Contract |
Overall Statement of Work: Boeing will assist the US Air Force in determining the best possible configurations for its future… |
$892,193 |
Huntington Beach |
CA |
1 |
0 |
| Contract |
Install new waterline to Bldg. 130 for washing town test station for aircraft. |
$6,810 |
Eglin Afb |
FL |
2 |
0 |
| Contract |
Install new concrete pad for dumpster access. |
$9,862 |
Eglin Afb |
FL |
2 |
-2 |
| Contract |
Remove old joint sealant and replace with new LOX sealant. The purpose is to facilitate government testing. |
$4,285 |
Eglin Afb |
FL |
2 |
0 |
| Contract |
Replace existing transformer |
$14,572 |
Eglin Afb |
FL |
2 |
0 |
| Contract |
Install an new generator and transfer switch to operate water well. |
$88,267 |
Eglin Afb |
FL |
3 |
-1 |
| Contract |
Install new communication equipment to remote water well sites. |
$298,901 |
Eglin Afb |
FL |
4 |
-1 |
| Contract |
Install new power, fire alarm and HVAC to existing building. |
$89,890 |
Eglin Afb |
FL |
7 |
-2 |
| Contract |
Remove old flooring and install new epoxy floor coating system in Bldg. 8640. |
$295,532 |
Eglin Afb |
FL |
8 |
-1 |