| Contract |
Project is to install 6' water line,fire hydrant,gate valves, access risers/water boxes at 71 Corps lane, carthage, tn Cordell Hull… |
$9,704 |
Gainesboro |
TN |
0 |
1 |
| Contract |
ARRA - Repair and Retrofit PH 1 HVAC Bldg 1. Providing special foundations to support the Thermal Energy Storage Tanks… |
$1,384,546 |
Edwards |
CA |
0 |
0 |
| Contract |
PLACE STONE PROTECTION ON UPSTREAM SIDE OF SCOUR HOLES BELOW WICKET DAM, LOCK & DAM 52 |
$464,000 |
Brookport |
IL |
0 |
0 |
| Contract |
replace bridge |
$2,496,145 |
Lanham |
MD |
0 |
-1 |
| Contract |
Repair/Refurbish of External Components of Military Quarters at Ft Myer, Va, Ft McNair, Washington, DC |
$379,500 |
Fort Belvoir |
VA |
0 |
-1 |
| Contract |
Repair Spesutie Island Roads |
$600,000 |
Aberdeen Proving Ground |
MD |
0 |
0 |
| Contract |
Provide labor and materials to install new ceiling and tiles in rooms 18 and 20 of building E3510 |
$121,364 |
Aberdeen |
MD |
0 |
-1 |
| Contract |
Provide all labor and materials to replace 3 boilers and boiler support equipment. |
$1,090,558 |
Aberdeen |
MD |
0 |
-1 |
| Contract |
Lower tower head repair pulley, replace stainless steel cable replace rubber cord and make repairs near bldg ELEXF5 near 14020 |
$19,782 |
Lampasas |
TX |
0 |
0 |
| Contract |
Replace existing air switches at facility EOHD5 with eleven 900amp load break switches |
$94,622 |
Lampasas |
TX |
0 |
0 |
| Contract |
Repair feeder number 7 to number 477 ACSR air switch at the intersection of Clear Creek Rd and Sante Fe… |
$571,138 |
Lampasas |
TX |
0 |
0 |
| Contract |
MAINT-REP-ALT/OTHER ADMIN BLDGS |
$22,364 |
Killeen |
TX |
0 |
0 |
| Contract |
The contractor will remediate mold in 14 buildings. |
$900,000 |
Killeen |
TX |
0 |
0 |
| Contract |
REPAIR DIESEL FIRE PUMP B/57005 |
$111,460 |
Killeen |
TX |
0 |
-1 |
| Contract |
Upgrade electric system, P-4400. |
$122,214 |
Fort Drum |
NY |
0 |
0 |
| Contract |
Emergency repairs to runway 15-33 |
$518,081 |
Fort Drum |
NY |
0 |
0 |
| Contract |
Contractor shall furnish all plant, labor, materials, and appliances necessary to perform all tasks to renovate Barracks Building P-10132, Fort… |
$1,847,672 |
Fort Drum |
NY |
0 |
0 |
| Contract |
Contractor shall furnish all plant, labor, materials, and appliances necessary to perform all tasks to renovate Barracks Building P-10214, Fort… |
$1,739,165 |
Fort Drum |
NY |
0 |
0 |
| Contract |
The Scope of Work for this project will consist of isolating, disconnecting and removing 5 each old frequency converters. The… |
$209,427 |
Fort Drum |
NY |
0 |
0 |
| Contract |
PROVIDE CRUSHED ROCK TO ROAD SHOULDERS |
$202,500 |
Fort Leonard Wood |
MO |
0 |
0 |