| Contract |
Building 122 Wheeler Army Air Field, Oahu Hi |
$87,231 |
Pearl City |
HI |
0 |
0 |
| Contract |
Replace emergency generator at Bldg 2737 at Naval Support Activity, Crane, Indiana |
$35,506 |
Crane |
IN |
3 |
0 |
| Contract |
This project consists of the demolition and reconstruction of the roof of the East portion of Building 3030; to include… |
$1,136,905 |
Fort Wainwright |
AK |
5 |
-1 |
| Contract |
Replace Roofs Buildings 2746 and 2747 at the Naval Support Activity, Crane, Indiana |
$172,330 |
Crane |
IN |
3 |
0 |
| Contract |
CCI shall provide all labor and materials to construct a 2,015 SF addition to the existing Firehouse #2 as well… |
$898,829 |
Fort Wainwright |
AK |
1 |
0 |
| Contract |
Renovate Unit Ops Bldg 13. Design, fabricate and install split HVAC system. |
$200,000 |
Picatinny Arsenal |
NJ |
0 |
0 |
| Contract |
Repair Fire Tower Ridge Trail |
$599,292 |
Fort Richardson |
AK |
16 |
0 |
| Contract |
repair bomb and mine bldgs |
$40,903 |
Warminster |
PA |
0 |
-1 |
| Contract |
Dredge approx. 2,500,000 cubic yards of material from the various channel sections in Baltimore Harbor. The Channels vary in depth… |
$4,415,500 |
Baltimore |
MD |
83 |
0 |
| Contract |
Construct New Bike Lanes on Tank Destroyer Ave from Comanche Ave to Clarke Road |
$41,135 |
Killeen |
TX |
0 |
-1 |
| Contract |
To provide a work plan/design required to execute the repair/renewal/construction effort for Carlyle Lake Replacement of Sewer Lines and Lift… |
$5,220,697 |
Carlyle |
IL |
0 |
-1 |
| Contract |
Replace roof Bldg 6, Fort Riley, Kansas |
$27,380 |
Fort Riley |
KS |
4 |
0 |
| Contract |
To design, fabricate and install twenty-one (21) trilateration survey stations. Melvin Price Locks and Dam (MPLD) (5), Lock and Dam… |
$1,377,722 |
West Alton |
MO |
1 |
0 |
| Contract |
Contractor shall furnish all plant, labor, materials, and appliances necessary to perform all tasks to install keyless entry in Buildings… |
$1,053,655 |
Watertown |
NY |
0 |
-1 |
| Contract |
Rend Lake Spillway Bridge Repair; Railroad Bridge Removal; Dredge of Silted-In Boating Areas; and Kaskaskia River Navigation Excavation in Benton,… |
$3,641,984 |
Benton |
IL |
0 |
0 |
| Contract |
Contractor shall furnish all plant, labor, materials, and appliances necessary to perform all tasks to renovate Barracks Building P-10114, Fort… |
$1,753,409 |
Fort Drum |
NY |
0 |
0 |
| Contract |
Design and construct a child development center for 0-5 years old. Job duration is 490 days from NTP. |
$10,949,190 |
Killeen |
TX |
2 |
0 |
| Contract |
The scope of work for this project will consist of Between-Occupancy Super Preventive Maintenance Work. This will include but not… |
$392,808 |
Fort Drum |
NY |
6 |
0 |
| Contract |
Design to Repair Sprinkler System US Army Medical Research & Material Command, Bldg. 42, Natick, MA. Bldg. 42 is approximately… |
$146,407 |
Atlanta |
GA |
1 |
-2 |
| Contract |
Construct Medical Buildings |
$861,661 |
Sparta |
WI |
30 |
-1 |