| Contract |
Installing new air conditioning systems (HVAC) in rooms #202, 202A, 203, 208 and 210 on the second floor in building… |
$259,000 |
|
|
7 |
0 |
| Contract |
INSTALL SIDING & WINDOWS AT CSMS-C |
$1,074,339 |
|
|
1 |
0 |
| Contract |
REPAIR/RENOVATE BARRACKS |
$920,276 |
Fort Wainwright |
AK |
12 |
0 |
| Contract |
This project consists of the demolition and reconstruction of the roof of the East portion of Building 3030; to include… |
$1,136,905 |
Fort Wainwright |
AK |
5 |
-1 |
| Contract |
This project consists of the demolition and reconstruction of the East IRMA roof of Building 3030 to include the built… |
$963,375 |
Fort Wainwright |
AK |
5 |
-1 |
| Contract |
CCI shall provide all labor and materials to construct a 2,015 SF addition to the existing Firehouse #2 as well… |
$898,829 |
Fort Wainwright |
AK |
1 |
0 |
| Contract |
Adjust doors and windows for opening and closing in Buildings 3444, 3446 and 3448. Clean kitchens, latrines, furniture and bedrooms… |
$226,016 |
Fort Wainwright |
AK |
1 |
-2 |
| Contract |
Repair Fire Tower Ridge Trail |
$599,292 |
Fort Richardson |
AK |
16 |
0 |
| Contract |
W911KB-08-D-0009, Task Order 0001 FTR279/280, Buildin 606 Battalion Opns Facility, Repair Interior and Building Systems for 4/25/ABCT - Contract Duration… |
$810,566 |
Fort Richardson |
AK |
5 |
0 |
| Contract |
This project consists of the demolition and reconstruction of the roof of Building 3015; to include the built up roof… |
$1,471,858 |
Fort Wainwright |
AK |
2 |
-1 |
| Contract |
Building 1001 shall have a complete cosmetic renovation to include patching, texture and paint. New switch plate covers, cove base,… |
$1,216,179 |
Fort Wainwright |
AK |
1 |
-1 |
| Contract |
Building 3450 shall have a cosmetic renovation to include Exterior painting, new concrete sidewalk All cove base shall be replaced,… |
$220,838 |
Fort Wainwright |
AK |
0 |
-1 |
| Contract |
Replace all carpet and padding in bldg 702 with 28oz fire rated commercial grade over a 3/8 Pad. To include… |
$63,973 |
Fort Wainwright |
AK |
1 |
-1 |
| Contract |
CCI shall demolish the existing windows in Building 662 and replace them with blast resistant windows. |
$773,267 |
Fort Wainwright |
AK |
2 |
-1 |
| Contract |
Prepare exterior surface of building 663 by removing loose paint, grease, grout, caulking and other debris with the use of… |
$937,107 |
Fort Wainwright |
AK |
2 |
-1 |
| Contract |
CCI shall demolish the existing windows in Building 661 and replace them with blast resistant windows. |
$582,495 |
Fort Wainwright |
AK |
1 |
-1 |
| Contract |
The intent of this Project is to provide and install a new HVAC system throughout a large portion of building… |
$3,528,540 |
Fort Wainwright |
AK |
2 |
-1 |
| Contract |
Repair/Repave W Montgomery Street |
$175,000 |
Fairbanks |
AK |
0 |
0 |
| Contract |
Repair Gravel Roads in Donnelly Training Area |
$1,200,000 |
Fairbanks |
AK |
0 |
0 |
| Contract |
Pave Fire Station Parking Area, only project awarded under this delivery order is WO#FPD-00018-7-J for $317,196.64 |
$318,000 |
Fairbanks |
AK |
0 |
0 |