| Contract |
#BS50-4S WACKER NEUSON RAMMER - 1 EACH |
$2,580 |
Utica |
NY |
3 |
0 |
| Contract |
2 ea Sweep Star Vac's |
$37,806 |
Stone Mountain |
GA |
0 |
-2 |
| Contract |
A/E to provide all professional, technical and investigative services to prepare working drawings and specifications, cost estimates and construction period… |
$62,846 |
Cedar Rapids |
IA |
0 |
0 |
| Contract |
air handler unit replacement phase II |
$3,640,000 |
North Little Rock |
AR |
1 |
0 |
| Contract |
All labor, materials, equipment and supervision to completely prepare site for building operations, including demolition and removal of existing structures… |
$1,437,428 |
Newport News |
VA |
0 |
0 |
| Contract |
All labor, materials, equipment and supervision to completely prepare site for building operations, including demolition and removal of existing structures… |
$187,048 |
Newport News |
VA |
0 |
0 |
| Contract |
Architectural and Engineering Design and preparation of construction documents and construction administration assistance for PACU at Samuel S. Stratton VA… |
$157,771 |
Albany |
NY |
6 |
-1 |
| Contract |
Architectural and Engineering Services for Bldg 3 Steps, Des Moines |
$9,370 |
Des Moines |
IA |
0 |
0 |
| Contract |
Architectural and Engineering Services for HVAC for Building 3 HVAC Remodel, Des Moines Iowa VA |
$123,670 |
Des Moines |
IA |
1 |
0 |
| Contract |
B129 CULTURAL TRANSFORMATION NURSING HOME MODERNIZATION Phase 1 |
$1,586,607 |
Tuskegee |
AL |
1 |
0 |
| Contract |
Backhoe |
$70,615 |
Stone Mountain |
GA |
0 |
0 |
| Contract |
Batavia Access Points Repairs |
$246,070 |
Batavia |
NY |
1 |
0 |
| Contract |
Building 29-HVAC replacement |
$637,622 |
Saint Cloud |
MN |
0 |
0 |
| Contract |
Building 3 Stairs/Building 5 Demolition |
$405,057 |
Fargo |
ND |
0 |
0 |
| Contract |
C Wing, Bldg 1, Carl Hayden VA Medical Center. redesign 19 offices and reception areas; new suspended ceiling in all… |
$374,085 |
Phoenix |
AZ |
0 |
0 |
| Grant |
Cameron Missouri State Veterans Home Emergency Generator Replacement |
$892,575 |
Cameron |
MO |
0 |
0 |
| Contract |
Cemetary Road Repair |
$24,044 |
North Little Rock |
AR |
1 |
0 |
| Contract |
CFP was contracted by the VA to design a renovation for an ultrasound department in the VA Memphis Hospital. |
$40,313 |
Memphis |
TN |
0 |
0 |
| Contract |
Chiller Loop Phase I |
$1,089,857 |
Waco |
TX |
0 |
0 |
| Contract |
Civil Engineering Services related to evaluation of existing roadways, determining priority repair areas and preparing construction drawings and specifications for… |
$25,282 |
Ann Arbor |
MI |
0 |
-1 |