| Contract |
The purpose of the project is to design and provide construction management services for the FY 09 Clinic Alternation, 45th… |
$14,779,557 |
Melbourne |
FL |
1 |
-4 |
| Contract |
Rehabilitate Water Treatment Facilities Lake Ouachita |
$52,528 |
Royal |
AR |
0 |
0 |
| Contract |
Furnish all plant, labor, material and equipment necessary to repair HVAC, maintenance docks in Building 4909 and 4828 in accordance… |
$597,266 |
Goldsboro |
NC |
0 |
-1 |
| Contract |
Furnish all plant, labor, material and equipment necessary to repair HVAC, electrical, and energy deficiencies in Building 1600 in accordance… |
$324,108 |
Goldsboro |
NC |
0 |
-1 |
| Contract |
T. O. # 3002, Project # AJJY 09-1125, Install Lightning Protection System, Andersen AFB, Guam |
$25,000 |
Apo |
AP |
6 |
0 |
| Contract |
The overall purpose of the contract is the demonstrations of multi-design point adaptive turbine engines that automatically adjust fan and… |
$2,642,448 |
Cincinnati |
OH |
26 |
-1 |
| Contract |
Title: Advanced Material Propulsion Initiative (AMPI) Advanced Non Destructive Evaluation (NDE) for Ceramic Matrix Composites (CMCs) - Addendum 2: Effects… |
$1,820,000 |
Dayton |
OH |
0 |
0 |
| Contract |
aafb misc renovations |
$596,498 |
Andrews Air Force Base |
MD |
1 |
-1 |
| Contract |
Furnish all labor, equipment and material, and performing all work in connection with repairing youth center roof, building 4103 |
$1,132,022 |
Goldsboro |
NC |
0 |
0 |
| Contract |
Repair by replacement Santa Rosa waterline. Install new waterline and rehabilitate tank. |
$6,631,973 |
Apo |
AP |
10 |
0 |
| Contract |
Adaptive Versatile Engine Technology |
$2,632,998 |
Indianapolis |
IN |
75 |
0 |
| Contract |
ADAPTIVE COMBUSTOR TECHNOLOGY FOR THE HIGH EFFICIENT TURBINE ENGINE (HEETE) PROGRAM |
$974,988 |
Indianapolis |
IN |
1 |
0 |
| Contract |
Laboratory Supplies |
$404 |
Pittsburgh |
PA |
0 |
0 |
| Contract |
Project includes design and construction of a solar pool heating system at the Combat Training Pool, Building 289. This system… |
$360,446 |
Cherry Point |
NC |
0 |
-3 |
| Contract |
ARRA-MODERNIZE WING B2 SPACE ENDOSCOPY SUITE |
$216,624 |
Santa Rita |
GU |
11 |
0 |
| Contract |
Contract N62473-08-D-8605 Task 0013 TAS::97 00501: TAS Recover Project: # P970M: TP# Facility Energy Improvements MCLB Barstow, CA AE Services |
$155,548 |
San Diego |
CA |
0 |
0 |
| Contract |
Project involves installation of Solar Photovoltaic Power systems (SPVPS) on the vehicle canopy structure and shall be sized to utilitize… |
$1,951,000 |
Seal Beach |
CA |
0 |
0 |
| Contract |
Photovoltaic System, Naval Air Warfare Center, China Lake, CA |
$5,896,578 |
Ridgecrest |
CA |
0 |
0 |
| Contract |
Restore Interior Spaces for Mental Health Clinic and Deployment Health Center at Naval Medical Center San Diego |
$916,000 |
San Diego |
CA |
0 |
0 |
| Contract |
Project involves design, construction, and utility interconnection for Solar Photovoltaic (PV) Electrical Generating System. The PV array shall be installed… |
$1,910,197 |
San Diego |
CA |
0 |
1 |