| Contract |
Maintenance Dredging Savannah Harbor Task Order No. 0008 |
$4,200,000 |
Savannah |
GA |
35 |
0 |
| Contract |
Old Bowley School Renovations, Ft. Bragg, NC |
$8,852,400 |
Fort Bragg |
NC |
0 |
0 |
| Contract |
Retrieval, classification and testing of soil samples retrieved for Morganza to the Gulf Feasibility Study. |
$70,163 |
Saint Rose |
LA |
20 |
0 |
| Contract |
2 TYPES OF STEEL LANTERN HANGERS, 63 REGULAR MODELS, 12 ADA REQUIREMENT MODELS |
$5,338 |
Woodruff |
WI |
6 |
-1 |
| Contract |
John Deere 770G Motor Grader |
$157,498 |
Crowell |
TX |
0 |
1 |
| Contract |
1. The Contractor shall supply all labor, materials, parts, oversight, and equipment to perform Periodic Inspections of the following dams:… |
$295,837 |
Woburn |
MA |
2 |
-1 |
| Contract |
boundary survey r.d. bailey lake |
$87,429 |
Chesapeake |
OH |
2 |
0 |
| Contract |
rc byrd l&d vertical and instrumentation/observation horizontal control to navd 1988/nad 1983 |
$36,738 |
Chesapeake |
OH |
2 |
0 |
| Contract |
Preparation of exsisting asphalt surfaces in order to resurface parking lots and exsisting roadways to accompolish a cleaner and safer… |
$559,163 |
Lewis Center |
OH |
7 |
0 |
| Contract |
Boom line of 1950 lf of boom line with 6' float and 12' skirt. |
$25,838 |
Tulsa |
OK |
0 |
-2 |
| Contract |
STUDENT DORMITORY (200 ROOMS) AND ASSOICATED SITE WORK, SECURITY CAMERAS, SID/CID DESIGN PACKAGE |
$22,764,000 |
Minneapolis |
MN |
0 |
-1 |
| Contract |
25 hp air compressors and one controller |
$33,210 |
Birmingham |
AL |
0 |
-1 |
| Contract |
Herbicide |
$20,803 |
Shreveport |
LA |
0 |
0 |
| Contract |
Levee Inspection Workshop |
$47,811 |
Bellevue |
WA |
1 |
0 |
| Contract |
Recovery maintenance dredging, Mispillion River, Entrance Channel and Inner Reach 'A' Ceder Creek, Delaware |
$648,631 |
Evansville |
IN |
12 |
0 |
| Contract |
Corey creek monolift repair |
$16,500 |
Mansfield |
PA |
5 |
0 |
| Contract |
Renovate Irwin Army community Hospital 2nd Floor Bldg 600 at Ft. Riley, KS |
$3,484,463 |
Fort Riley |
KS |
0 |
0 |
| Contract |
GRR for Savannah Harbor Deepening Project |
$200,999 |
Vienna |
VA |
1 |
-1 |
| Contract |
Coordination and execution of outreach events for the 2009 Regulatory Division 3rd Annual Road Shows. |
$169,773 |
Hollywood |
FL |
6 |
0 |
| Contract |
: Furnish all labor, material, equipment, incidentals, supervision and transportation for work necessary to upgrade gates and perimeter security. Scope:… |
$204,855 |
Pope A F B |
NC |
0 |
0 |