| Contract |
Airfield Markings |
$544,314 |
Travis Afb |
CA |
10 |
0 |
| Contract |
CONSTRUCT PERIMETER VEHICLE DENIAL FENCE SYSTEM |
$699,970 |
Travis Afb |
CA |
4 |
0 |
| Contract |
Install Auto Fire Protection System LRAFB Building 1020 |
$115,270 |
Little Rock Air Force Base |
AR |
7 |
0 |
| Contract |
Install Auto Fire Protection System LRAFB Building 1024 |
$128,031 |
Little Rock |
AR |
7 |
1 |
| Contract |
Install Fire Suppression at Building 1205. |
$504,501 |
Travis Afb |
CA |
2 |
0 |
| Contract |
Install Fire Suppression at Building 247. |
$196,447 |
Travis Afb |
CA |
4 |
0 |
| Contract |
Install ground source heat pumps,the principal items of work include, but no limited to demolishing existing HVAC system at bldg… |
$82,462 |
Mcconnell Afb |
KS |
9 |
-1 |
| Contract |
Painting of Exterior Buildings |
$714,584 |
Travis Afb |
CA |
0 |
0 |
| Contract |
Remove and Replace Roll up Door with Vault Door |
$62,001 |
Travis Afb |
CA |
0 |
0 |
| Contract |
Repair Airfield Spalls & Joints. Airfield Spall & Joint Seal Repair JFSD 200821 at Grand Forks AFB ND |
$999,997 |
Grand Forks Afb |
ND |
10 |
-1 |
| Contract |
Repair building 1127 for SOAR. Abate asbestos from building, install new exit lights and pull stations at each exit, install… |
$670,079 |
Mcconnell Afb |
KS |
8 |
0 |
| Contract |
Repair concrete spalls and cracks on H Taxiway at McChord Airforce Base. |
$1,241,445 |
Renton |
WA |
0 |
0 |
| Contract |
Repair Natural Gas System Mains, Main Gate, Main Gate to Skymaster, Skymaster to Broadway, Broadway to Winward XDAT #07-1113, 07-1114,… |
$2,256,905 |
Travis Afb |
CA |
6 |
0 |
| Contract |
Repair Natural Gas Systems Mains, 1200 Area and First Street, XDAT #07-1122 Travis AFB |
$549,536 |
Travis Afb |
CA |
1 |
0 |
| Contract |
Repair Roof Seals, B/1115. Removed metal soffit on the outside of the facility, injected a low expansion foam material to… |
$35,162 |
Mcconnell Afb |
KS |
0 |
0 |
| Contract |
Repair Roofs basewide facilities Miscellaneous removal of existing roofing and replace with new BUR or asphalt shingles or clay tile… |
$399,983 |
Tacoma |
WA |
0 |
-2 |
| Contract |
Repair Roofs basewide facilities miscellanous removal of existing roofing and replace with new BUR or asphalt shingles or clay tile |
$409,105 |
Tacoma |
WA |
10 |
-1 |
| Contract |
Repair Shower/Finishes Dorm772 |
$441,810 |
Little Rock Air Force Base |
AR |
0 |
-1 |
| Contract |
Runway Rubber Removal |
$349,780 |
Travis Afb |
CA |
14 |
0 |
| Contract |
The wrok consist of furnishing all plant, labor and material in performing all operations in connection with the construction, demolition… |
$3,064,886 |
Little Rock Air Force Base |
AR |
13 |
0 |