| Contract |
Install Concrete Pad. Mobilize, saw cut and construct a concrete pavement including painting as per drawings. |
$138,138 |
Panama City |
FL |
0 |
0 |
| Contract |
Extend Overrun Runway. Mobilize and provide a 2' asphalt layer on 18 end overrun at the Drone runway as per… |
$304,078 |
Panama City |
FL |
0 |
-1 |
| Contract |
Extend Flightline Road. |
$54,159 |
Panama City |
FL |
0 |
0 |
| Contract |
Repair Overruns, Drone Runway. Mobilize and provide 2' asphalt layer on each overrun at the Drone runway as per drawings. |
$713,500 |
Panama City |
FL |
0 |
0 |
| Contract |
Maintain Paint Airfield. Paint approximately 501,505 SF of airfield marking and remove approximately 47,369 SF in preparation of new painted… |
$318,052 |
Panama City |
FL |
0 |
0 |
| Contract |
Slurry Seal Inside Runway. Mobilize and slurry seal areas indicated on drawings. Remove rubber from both touch down zones as… |
$291,476 |
Panama City |
FL |
0 |
0 |
| Contract |
Repair Joints Phase III. |
$199,995 |
Panama City |
FL |
0 |
0 |
| Contract |
Install Covers at Unaccompanied Officer Quarters sub-phases A1, A2, B1 and B2. General work includes acquiring steel materials for columns… |
$501,454 |
Laughlin A F B |
TX |
2 |
-1 |
| Contract |
Remove and replace a 1000 SF built-up roof (BUR) system located on the control tower, building 309. Work incorporates the… |
$71,484 |
Laughlin A F B |
TX |
2 |
0 |
| Contract |
Power wash and overcoat exterior coating system. Power tool clean and specific rust and delaminating coating using vacuum assist power… |
$201,224 |
Laughlin A F B |
TX |
2 |
0 |
| Contract |
DTS South shall provide all labor, tools, materials and equipment required to perform construction, maintenance, and restoration at facilities 280,295,370,421,9718,9433,9456,9466,9468,9480,9484,… |
$119,149 |
Panama City |
FL |
2 |
-1 |
| Contract |
Repair the Military Working Dog (MWD) Kennels. Work will include removal of the concrete top coating and floor sealer, grinding… |
$64,902 |
Laughlin A F B |
TX |
2 |
0 |
| Contract |
Repair Storm Drain Near Building 335. Mobilize and remove soil to replace storm drain pipe as indicated on drawings. All… |
$234,010 |
Panama City |
FL |
7 |
0 |