| Contract |
rental of workstations to accommodate staffing increases |
$60,640 |
|
|
0 |
0 |
| Contract |
Purchase of 1 x 304CCR Caterpillar compact excavator with requested delivery date of November 2009. |
$52,489 |
|
|
0 |
0 |
| Contract |
rental of workstations to accommodate staffing increases |
$60,640 |
|
|
0 |
0 |
| Contract |
Purchase of 1 x 320DL Caterpillar hydraulic excavator with a requested delivery date of October 2009. |
$157,148 |
|
|
0 |
0 |
| Contract |
Architectural and Engineering Design and preparation of construction documents and construction administration assistance for PACU at Samuel S. Stratton VA… |
$157,771 |
Albany |
NY |
6 |
-1 |
| Contract |
Replace concrete slab, repair foundation wall at OH doors, damaged brick and missing mortar at the rop course, repair foundation… |
$229,476 |
Albany |
NY |
1 |
-1 |
| Contract |
Replace HVAC System in Bldg 92 |
$1,875,000 |
Alden |
NY |
0 |
-1 |
| Contract |
Demolition/Abatement of Buildings 6,7,11 and 35 |
$500,180 |
Alden |
NY |
0 |
-1 |
| Contract |
Removal/Replacement of all fire sprinkler valves and water flow switches. Install new underground main and control valves on main water… |
$340,000 |
Amarillo |
TX |
2 |
0 |
| Contract |
Nursing Home Remodels-Phase II to include general construction, minor demolition, alterations, |
$396,000 |
Amarillo |
TX |
0 |
0 |
| Contract |
Install replacement fire alarm panels and peripheral devices at the Amarillo VA Health Care facility in Amarilo, TX |
$124,504 |
Amarillo |
TX |
2 |
0 |
| Contract |
Construct 2-story addition to Community Living Center, Bldg. 29 |
$430,000 |
Amarillo |
TX |
2 |
0 |
| Contract |
Civil Engineering Services related to evaluation of existing roadways, determining priority repair areas and preparing construction drawings and specifications for… |
$25,282 |
Ann Arbor |
MI |
0 |
-1 |
| Contract |
Repair and replacement of waterlines, fire hydrants, and valves. |
$342,000 |
Asheville |
NC |
8 |
-3 |
| Contract |
Execute the design-build contract to provide a facility for the operation of one Siemens Biograph 16 PET/CT scanner unit. The… |
$735,920 |
Augusta |
GA |
0 |
0 |
| Contract |
Furnish all necessary labor, materials, and equipment for the demolition and removal of existing construction and work required to renovate… |
$872,000 |
Augusta |
GA |
0 |
1 |
| Contract |
Replace AHUs Bldg 82. Furnish design, all labor, materials, and equipment to replace both Air Handler Units and complete other… |
$509,542 |
Augusta |
GA |
4 |
0 |
| Contract |
Batavia Access Points Repairs |
$246,070 |
Batavia |
NY |
1 |
0 |
| Contract |
Provide A/E design services for replacement of the elevator in Building 4 Research. This includes the construciton of a new… |
$53,605 |
Bel Air |
MD |
0 |
0 |
| Contract |
Provide A/E design services to survey the Loch Raven Medical Center campus in Baltimore, MD to evaluate the drainage and… |
$96,511 |
Bel Air |
MD |
0 |
0 |