| Grant |
Spirit Lake rural water supply system, water treatment plant design, pilot plant study, and well field expanision/investigation. |
$1,400,000 |
Fort Totten |
ND |
0 |
0 |
| Contract |
RECOVERY - SF6 Circuit Breaker Maintenance at Mt Elbert Powerplant, Fryingpan-Project, Colorado |
$418,660 |
Granite |
CO |
4 |
0 |
| Grant |
HUNTINGTON CLEVELAND SALINITY REDUCTION PROJECT |
$2,902,538 |
Huntington |
UT |
4 |
0 |
| Grant |
El Monte Valley Groundwater Recharge, Mining, and Reclamation Project, Pre-Construction Phase: Environmental Documentation |
$300,000 |
La Mesa |
CA |
6 |
12 |
| Contract |
Boat motor |
$9,606 |
Lake Placid |
FL |
1 |
-6 |
| Grant |
Long Beach Desalination Research and Development Project |
$2,856,000 |
Long Beach |
CA |
6 |
1 |
| Grant |
Peoples Canal Pipeline Project |
$5,012,364 |
Manila |
UT |
0 |
0 |
| Contract |
Provide Environmental Water Quality Monitoring Instrumentation: Multi Parameter Water Quality Loggers; Optical DO Probes; Model 650 Display(s); Field Cables (500ft);… |
$95,577 |
Marion |
MA |
0 |
-1 |
| Contract |
Water Level Staff Gauges |
$3,243 |
Mesa |
AZ |
0 |
-1 |
| Contract |
INSTALLATION OF THE SECOND BARRELS OF THE WEBER BRANCH SIPHON AND THE WEBER COULEE SIPHON EAST LOW CANAL |
$20,237,463 |
Moses Lake |
WA |
0 |
2 |
| Contract |
Provided site topography covering an area approximately 7.1 acres in size lying within the area of an existing fish hatchery.… |
$32,163 |
Mountlake Terrace |
WA |
1 |
0 |
| Grant |
Contra Cost Fish Screen Project - Phase II Rock Slough |
$6,334,500 |
Oakley |
CA |
13 |
0 |
| Grant |
Canal Lining and Forebay Channel and Headworks Replacement |
$3,488,518 |
Ogden |
UT |
4 |
0 |
| Grant |
Phase 1E, Regional Brine Line, Calleguas Municipal Water District Recycling Project |
$4,885,000 |
Oxnard |
CA |
4 |
0 |
| Grant |
Water Resources Sustainabiltiy Enhancements in Peoria, Arizona |
$1,693,291 |
Peoria |
AZ |
0 |
-1 |
| Contract |
Samples Bottles |
$3,903 |
Pittsburgh |
PA |
0 |
0 |
| Grant |
Construction of a Phase II Water Treatment Plant; Construction of a Raw Water Intake Extension Pipeline; Construction of a Regional Transmission Pipeline from a Water Treatment Plant to the Community of Poplar, and Project management and administration |
$39,800,000 |
Poplar |
MT |
6 |
-1 |
| Grant |
Tule River Intertie Project |
$2,143,533 |
Porterville |
CA |
35 |
0 |
| Contract |
Create a water bank, line a specific amount of canal, and install various types of measuring devices. Increasing the efficiency… |
$3,638,759 |
Preston |
ID |
0 |
0 |
| Grant |
Recovery Act - Fish Passage Improvement Project at the Red Bluff Diversion Dam, Temporary Pumping Project |
$5,250,000 |
Red Bluff |
CA |
94 |
1 |