| Contract |
Provide Environmental Water Quality Monitoring Instrumentation: Multi Parameter Water Quality Loggers; Optical DO Probes; Model 650 Display(s); Field Cables (500ft);… |
$95,577 |
Marion |
MA |
0 |
-1 |
| Contract |
Railroad track removal and installation. Land Contract. |
$300,000 |
Warden |
WA |
0 |
0 |
| Contract |
Contractor will perform and prepare an Alternative Evaluation Report engineering study for a portion of the Preston Reach of the… |
$285,714 |
Seattle |
WA |
0 |
0 |
| Contract |
Water Level Staff Gauges |
$3,243 |
Mesa |
AZ |
0 |
-1 |
| Contract |
RECOVERY - SF6 Circuit Breaker Maintenance at Mt Elbert Powerplant, Fryingpan-Project, Colorado |
$418,660 |
Granite |
CO |
4 |
0 |
| Contract |
Provided site topography covering an area approximately 7.1 acres in size lying within the area of an existing fish hatchery.… |
$32,163 |
Mountlake Terrace |
WA |
1 |
0 |
| Contract |
Yuma Area Office Seismic Rehabilitation |
$145,250 |
Saint Louis |
MO |
0 |
-1 |
| Contract |
This is a modification to an existing construction contract no. 08CC603730, awarded 9/9/2009, full and open competition. This modification provides… |
$324,383 |
Columbus |
OH |
6 |
0 |
| Contract |
Road 16-NE, Crab Creek Crossing |
$1,000,000 |
Ephrata |
WA |
0 |
0 |
| Contract |
The Bureau of Reclamation contracted labor for hand-planting of wetland plants at the Imperial Ponds Conservation Area (Imperial National Wildlife… |
$12,691 |
Yuma |
AZ |
1 |
1 |
| Contract |
INSTALLATION OF THE SECOND BARRELS OF THE WEBER BRANCH SIPHON AND THE WEBER COULEE SIPHON EAST LOW CANAL |
$20,237,463 |
Moses Lake |
WA |
0 |
2 |
| Contract |
Recovery Multi species conservation program wetland plugs Imperial Ponds Native fish Habitat Expansion Project No 23000 |
$21,840 |
Albuquerque |
NM |
0 |
0 |
| Contract |
MICROSCOPE |
$9,283 |
Worcester |
PA |
0 |
-1 |
| Contract |
Flow Cytometer |
$166,325 |
Yarmouth |
ME |
2 |
-1 |
| Contract |
Create a water bank, line a specific amount of canal, and install various types of measuring devices. Increasing the efficiency… |
$3,638,759 |
Preston |
ID |
0 |
0 |
| Contract |
Task Oder #2 |
$2,859,656 |
Yuma |
AZ |
0 |
-2 |
| Contract |
GPS RECEIVERS |
$3,431 |
Astoria |
NY |
0 |
-1 |
| Contract |
Samples Bottles |
$3,903 |
Pittsburgh |
PA |
0 |
0 |
| Contract |
Engineering Design Services- Planning and design of a water supply intake/fish screen structure, water supply intake conduit, water supply pumping… |
$789,621 |
Boise |
ID |
2 |
0 |
| Contract |
This task order is for construction observation assistance during construction of improvements to facilities of the Methow Valley Irrigation District… |
$67,171 |
Boise |
ID |
0 |
-1 |