| Contract |
Provide 135 Accelerograph Appliance Units and ancillary optional equipment |
$489,950 |
|
|
0 |
0 |
| Contract |
Evaluation and Monitoring of Long Valley Caldera volcanic activity, including associated seismic and geologic hazards. Contract of $76,857 to two… |
$76,857 |
Sacramento |
CA |
1 |
-3 |
| Contract |
Scientific weather tracking equiptment |
$21,189 |
Menlo Park |
CA |
0 |
0 |
| Contract |
Temperature monitoring |
$22,390 |
San Leandro |
CA |
0 |
-1 |
| Contract |
Riverboat SP for StreamPro ADCP Riverboat for Rio Grande ADCP without GPS Riverboat for Rio Grande with ADCP |
$135,583 |
Oceanside |
CA |
1 |
1 |
| Contract |
Supply accelerometer and other earthquake monitoring equipment to modernize the Advanced National Seismic System (ANSS). |
$920,951 |
Pasadena |
CA |
2 |
0 |
| Contract |
Supply accelerometer and other earthquake monitoring equipment to modernize the Advanced National Seismic System (ANSS). |
$760,733 |
Pasadena |
CA |
1 |
0 |
| Contract |
Acoustic Doppler Hand-held Portable Water Velocity / Flow Measurement System. 81 Handheld Flowtrackers; 15 Shallow Water Acoustic Dopplers; 3 Acoustic… |
$732,251 |
San Diego |
CA |
6 |
0 |
| Contract |
Acoustic Doppler Current Profiler, Streampro and Workhorse Rio |
$658,070 |
Poway |
CA |
0 |
1 |
| Contract |
Supply accelerometer and other earthquake monitoring equipment to modernize the Advanced National Seismic System (ANSS). |
$651,199 |
Pasadena |
CA |
1 |
0 |
| Contract |
Supply and install safety equipment for the research vessel 'Turning Tide' including canister life raft, rails, zodiac, modifying vessel for… |
$65,830 |
Richmond |
CA |
3 |
0 |
| Grant |
Upgrade of Joint USGS-Caltech Southern California Seismic Network |
$1,200,000 |
Pasadena |
CA |
0 |
0 |
| Grant |
Upgrading the Broadband and Borehole Seismic Networks Operated by the Berkeley Seismological Laboratory at the University of California, Berkeley |
$721,000 |
Berkeley |
CA |
0 |
0 |
| Grant |
Modernization of ANSA Seismic Network Equipment |
$146,617 |
La Jolla |
CA |
0 |
0 |
| Contract |
The US Geological Survey Advanced National Seismic System (ANSS) National Operations Center (NOC) in Golden, Colorado has commenced the development… |
$67,777 |
Golden |
CO |
1 |
-1 |
| Contract |
The project work is in the Central Region Geologic Hazards Team, Geologic Division, which is headquartered in Golden, Colorado. The… |
$188,950 |
Golden |
CO |
1 |
0 |
| Contract |
The mission of the National Earthquake Information Center (NEIC) is to determine rapidly the location and size of all destructive… |
$116,828 |
Golden |
CO |
1 |
0 |
| Contract |
Provide water temperature/conductivity/level sensor/dataloggers. |
$20,355 |
Fort Collins |
CO |
0 |
0 |
| Contract |
Deliverables: Service, electronic feedback installation and upgrade to existing Model G Gravity Meters (Quantity 2) |
$49,200 |
Lafayette |
CO |
0 |
0 |
| Contract |
Deliverables: Quantity 2 Model CG5 gravity meters |
$190,000 |
Lafayette |
CO |
1 |
0 |