| Grant |
Transit Capital Assistance |
$33,963,166 |
Sacramento |
CA |
0 |
-1 |
| Grant |
Replacement of Train Auxiliary Power Equipment, Cables on Transbay Tube, and Coverboards, Improve walkway safey at a station, Car Interior Modifications, and Wheel Truing Machine Study. |
$17,104,568 |
Oakland |
CA |
1 |
0 |
| Grant |
Bus Shelter Construction |
$1,711,239 |
Tracy |
CA |
0 |
1 |
| Grant |
Infrastructure Enhancement and Maintenance Projects |
$67,245,980 |
San Francisco |
CA |
223 |
-1 |
| Grant |
ARRA Transit Investments |
$3,134,985 |
Fairfield |
CA |
0 |
0 |
| Grant |
Transit Operations, Americans with Disabilities Act Paratransit Operations, Preventative Maintenance, Transit Enhancements |
$4,289,133 |
Santa Rosa |
CA |
10 |
0 |
| Grant |
Capital Projects / Vehicle Purchase |
$10,206,069 |
Lancaster |
CA |
10 |
0 |
| Grant |
Lease (46) 40-Ft Buses |
$7,658,196 |
Monterey |
CA |
80 |
0 |
| Grant |
PM/Constr bus station/maint fac/equip |
$6,941,181 |
Stockton |
CA |
108 |
1 |
| Grant |
Track Rehab, Positive Train Control |
$19,474,642 |
Los Angeles |
CA |
0 |
0 |
| Grant |
Commuter Fleet Expansion |
$128,459 |
Marysville |
CA |
0 |
-1 |
| Grant |
Capital equipment and security improvements. |
$1,342,268 |
Lompoc |
CA |
0 |
0 |
| Grant |
El Centro Bus Transfer Terminal- engineering and construction |
$1,221,911 |
El Centro |
CA |
0 |
-1 |
| Grant |
Purchase of 2 replacement paratransit vehicles. |
$124,748 |
Claremont |
CA |
0 |
-1 |
| Grant |
30' and 35' Bus Replacements and Bus Stop Improvements |
$727,900 |
Redondo Beach |
CA |
0 |
0 |
| Grant |
Replacement Vehicles |
$302,000 |
San Jose |
CA |
0 |
0 |
| Grant |
ITS Upgrades |
$4,200 |
San Jose |
CA |
0 |
0 |
| Grant |
Metro Gold Line Eastside Extension |
$66,740,000 |
Los Angeles |
CA |
1,167 |
0 |
| Grant |
FY 2009 Preventive Maintenance (Rail) |
$946,296 |
Sacramento |
CA |
27 |
0 |
| Grant |
Installation of five canopies at the Metro Red Line escalator entrances. |
$6,770,224 |
Los Angeles |
CA |
0 |
0 |