| Contract |
Charbonneau Park Potable Water System Treatment Facility |
$998,000 |
Pasco |
WA |
0 |
0 |
| Contract |
Child Development Center Fort Drum, NY |
$6,357,600 |
Fort Drum |
NY |
24 |
0 |
| Contract |
Complete design and construction of energy efficient ground source heat system |
$2,860,163 |
Rapid City |
SD |
1 |
0 |
| Contract |
Complete design and construction to replace Capehart Pumping Station B9529 at Ellsworth AFB, SD. |
$619,409 |
Rapid City |
SD |
0 |
0 |
| Contract |
CONCRETE SLAB AND INSTALLATION AT FRL |
$13,500 |
Stone Mountain |
GA |
4 |
0 |
| Contract |
Conducting an independent technical review of the design architects design for the Langley Medical Treatment and Outpatient Building 74 at… |
$1,208,592 |
Hampton |
VA |
0 |
0 |
| Contract |
controls work plan |
$212,704 |
Arlington |
TX |
1 |
1 |
| Contract |
Coordination and execution of outreach events for the 2009 Regulatory Division 3rd Annual Road Shows. |
$169,773 |
Hollywood |
FL |
6 |
0 |
| Contract |
Corey creek monolift repair |
$16,500 |
Mansfield |
PA |
5 |
0 |
| Contract |
corey creek monolift repair |
$165,000 |
Mansfield |
PA |
5 |
0 |
| Contract |
DAM AND SCOUR REPAIR, LOCK AND DAM #5, ALLEGHENY RIVER, FREEPORT, PA |
$883,500 |
Tarentum |
PA |
0 |
0 |
| Contract |
Design - build a replacement paint booth in aircrafe dock on Ellsworth AFB, SD. |
$397,982 |
Rapid City |
SD |
0 |
0 |
| Contract |
Design and Construction of Bridge 25459 in Ft. Rucker, AL |
$184,905 |
Fort Rucker |
AL |
3 |
0 |
| Contract |
Design and construction of bridge 25463 at Ft. Rucker, AL |
$172,486 |
Fort Rucker |
AL |
3 |
0 |
| Contract |
Design and construction of bridge 40161 at Ft. Rucker, AL |
$342,213 |
Fort Rucker |
AL |
3 |
0 |
| Contract |
Design and construction of bridge repairs to bridge 09813 Ft. Rucker, AL |
$378,780 |
Fort Rucker |
AL |
3 |
0 |
| Contract |
Design-Build of Child Development Center, Hurlburt Field, FL |
$7,460,948 |
Hurlburt Field |
FL |
5 |
-6 |
| Contract |
Development of an interactive online training module for the Jacksonville District Regulatory Division; geared towards individuals who need to fill… |
$270,030 |
Hollywood |
FL |
6 |
0 |
| Contract |
Ecosystem Restoration General Investigation Feasibility Study/Draft PEIS Lower Willamette River |
$573,375 |
Portland |
OR |
5 |
0 |
| Contract |
Electric Hot Water Power Washer |
$5,707 |
Camas |
WA |
1 |
-1 |