| Contract |
Herbicide |
$62,410 |
Shreveport |
LA |
0 |
0 |
| Contract |
The purpose of the work is to collect supplemental geologic information at the interface of the dam embankment and foundation.… |
$364,852 |
Woburn |
MA |
2 |
-1 |
| Contract |
Design and construction of bridge repairs to bridge 09813 Ft. Rucker, AL |
$378,780 |
Fort Rucker |
AL |
3 |
0 |
| Contract |
Preparation of exsisting asphalt surfaces in order to resurface parking lots and exsisting roadways to accompolish a cleaner and safer… |
$495,579 |
Bainbridge |
OH |
7 |
0 |
| Contract |
Ecosystem Restoration General Investigation Feasibility Study/Draft PEIS Lower Willamette River |
$573,375 |
Portland |
OR |
5 |
0 |
| Contract |
controls work plan |
$212,704 |
Arlington |
TX |
1 |
1 |
| Contract |
Furnish all Design/Engineering Services, plant, labor, equipment, instruments, materials, transportation, and incidentals required to repair or replace the Chilled Water… |
$5,275,000 |
Oklahoma City |
OK |
15 |
0 |
| Contract |
Design and construction of bridge 40161 at Ft. Rucker, AL |
$342,213 |
Fort Rucker |
AL |
3 |
0 |
| Contract |
The purpose of this project is to evaluate the quality of dredged material from the Federal navigation channels in Mobile… |
$509,140 |
Sparks Glencoe |
MD |
0 |
0 |
| Contract |
Resiliant flooring replacement at Womack Army Medical Center, Fort Bragg, NC |
$3,705,210 |
Franklin |
TN |
11 |
-2 |
| Contract |
Replacement of failing smoke detectors at the Madigan Army Medical Center, Fort Lewis, WA |
$472,448 |
Tacoma |
WA |
0 |
-2 |
| Contract |
Perform all personnel, plant, equipment, transportation and materials necessary to perform and deliver all data in connection with ADCIRC Boundary… |
$75,507 |
Jacksonville |
FL |
1 |
1 |
| Contract |
Development of an interactive online training module for the Jacksonville District Regulatory Division; geared towards individuals who need to fill… |
$270,030 |
Hollywood |
FL |
6 |
0 |
| Contract |
Repair/renovate COF area inside of building C-8344. Contract Duration is 180 days from NTP. |
$149,522 |
Fort Bragg |
NC |
2 |
-1 |
| Contract |
Furnish all labor, material, equipment, incidentals, supervision and transportation for work necessary to Repair/Renovate Bldg C-1137, Ft. Bragg, NC. Contract… |
$470,937 |
Fort Bragg |
NC |
2 |
0 |
| Contract |
Procurement & Deliver of Stone, Sand & Rip Rap to W.Kerr Scott Reservoir, Wilkesboro,NC for campsite renovation, road repairs and… |
$175,150 |
Rockwell |
NC |
6 |
0 |
| Contract |
REPLACE CHAPLIN ROOF |
$671,735 |
Augusta |
GA |
0 |
0 |
| Contract |
The purpose of this task order is to obtain planning and environmental services to assist in preparing drafts of the… |
$1,838,200 |
Los Angeles |
CA |
0 |
-1 |
| Contract |
Maintenance Dredging Savannah Harbor Task Order No. 0008 |
$4,200,000 |
Savannah |
GA |
35 |
0 |
| Contract |
electrical upgrades |
$97,891 |
Lemon Cove |
CA |
1 |
-1 |