| Contract |
PAVE POL ROAD AT TANK FARM PUMP HOUSE 3 (PH3), ELMENDORF AFB, ALASKA. |
$520,000 |
Elmendorf Afb |
AK |
0 |
0 |
| Contract |
Repair Quarry Hill Road |
$379,465 |
Fairbanks |
AK |
4 |
0 |
| Contract |
Install fire alarm system at Point Barrow Long Range Radar Site. |
$404,097 |
Elmendorf Afb |
AK |
1 |
0 |
| Contract |
Replace heat banks in radar tower at Kotzebue, Tin City, and Cold Bay Long Range Radar Sites. |
$489,748 |
Elmendorf Afb |
AK |
1 |
0 |
| Contract |
Replace AHU in Building 8317 |
$138,523 |
Elmendorf Afb |
AK |
0 |
0 |
| Contract |
Replace Backflow Preventors Basewide |
$499,533 |
Elmendorf Afb |
AK |
0 |
0 |
| Contract |
Replace Concrete snow melt system under Susitna Club (B-9387) Canopy Drive thru |
$160,989 |
Elmendorf Afb |
AK |
1 |
0 |
| Contract |
Pave Parking Lot Building 1232 |
$44,858 |
Fairbanks |
AK |
1 |
0 |
| Contract |
TO 5086-Recovery-FTQW051015-Repair Existing Insulation and Siding at Launch Facility (B4231) |
$199,764 |
Eielson Afb |
AK |
1 |
0 |
| Contract |
RECOVERY-DXEB-04-0101 REPAIR POWER PLANT COAL CRUSHERS |
$1,000,635 |
Clear |
AK |
6 |
0 |
| Contract |
Replace Storm Lines and manholes west of taxiway A and restore surface. |
$1,499,999 |
Elmendorf Afb |
AK |
3 |
0 |
| Contract |
REPAIR THRESHOLD LIGHTS, RUNWAY 16, ELMENDORF AFB, ALASKA. |
$385,000 |
Elmendorf Afb |
AK |
0 |
0 |
| Contract |
Repair CE Headquarters Heating System, Bldg 2258 |
$1,720,821 |
Eielson Afb |
AK |
0 |
0 |
| Contract |
Lakeshore will demolish 72 units and one garage complex and construct 76 Military Family Housing (MFH) units with all necessary… |
$49,359,000 |
Eielson Afb |
AK |
2 |
1 |
| Contract |
REPAIR COMBAT ALERT CELLS 1-4 PAVEMENT, ELMENDORF AFB, ALASKA. |
$1,400,000 |
Elmendorf Afb |
AK |
1 |
0 |
| Contract |
TO 5085-Recovery-FTQW081508-Replace Siding, Windows, Doors, Inslulation (B3383). |
$262,509 |
Eielson Afb |
AK |
3 |
0 |
| Contract |
TO 5093-Recovery-FTQW042431-Repair HVAC System in Firehouse 2 (B4870) |
$656,866 |
Eielson Afb |
AK |
0 |
0 |
| Contract |
TO 5094-Recovery-FTQW071507-Replace Steam Traps in Amber Hall (B3112) |
$375,977 |
Eielson Afb |
AK |
0 |
0 |
| Contract |
Recovery--Repair Cooling Pond at Clear AS |
$1,124,628 |
Fairbanks |
AK |
2 |
0 |
| Contract |
Repair the IRMA Roofing System of Building 1338 by replacement with an EPDM Roofing System. The roof area in this… |
$505,035 |
Eielson Afb |
AK |
0 |
0 |