| Contract |
Replace Roofing on Building 799, Luke AFB, AZ. |
$217,543 |
|
|
15 |
0 |
| Contract |
Repair Tennessee Avenue and Parking Lot near Building 3448 on Andrews AFB, MD |
$112,326 |
|
|
4 |
0 |
| Contract |
'Recovery' Replace roof at building 3066 |
$126,500 |
|
|
14 |
0 |
| Contract |
Provide thirteen 25' by 25' replacement concrete slabs and 1,962.89 square feet of spall repairs to airfield pavemnts. |
$499,950 |
Abilene |
TX |
31 |
0 |
| Contract |
Clean and reseal joints among 25' by 25' concrete slabs on aircraft parking apron and Taxiway 'A' for a quantity… |
$2,050,390 |
Abilene |
TX |
16 |
0 |
| Contract |
Mill two inches deep followed by placement of two inches deep hot mixed asphaltic concrete on taxiway asphalt shoulders |
$1,055,992 |
Abilene |
TX |
20 |
0 |
| Contract |
Replace nineteen 25-ft by 25-ft concrete slabs along Taxiway 'A' that are shattered and generating foreign object debris. |
$552,600 |
Abilene |
TX |
31 |
0 |
| Contract |
Replace fifty-three 25' by 25' concrete slabs along taxiway 'A' that are shattered and generating foreign object debris. |
$1,500,000 |
Abilene |
TX |
31 |
0 |
| Contract |
Mill the runway's asphalt overruns (66,700 SQ FT) one-inch, followed by one-inch asphalt overlay and restriping chevrons. |
$1,096,007 |
Abilene |
TX |
24 |
0 |
| Contract |
Nonpersonal services to include all parts, labor, equipment, materials and transportation for HVAC Duct Cleaning and Mold Decontamination for Bldg… |
$172,033 |
Albany |
GA |
4 |
0 |
| Contract |
Non personal services to include all parts, labor, equipment, materials, and transportation, for HVAC Duct Cleaning and Mold Decontamination for… |
$348,312 |
Albany |
GA |
4 |
0 |
| Contract |
Advanced Manufacturing Techniques for Large Area Solid Oxide Fuel Cells and Energy Applications |
$622,896 |
Albuquerque |
NM |
10 |
0 |
| Contract |
Solar power has become the most viable way for powering satellites and other space vehicles. The expense of putting objects… |
$5,654,192 |
Albuquerque |
NM |
3 |
1 |
| Contract |
Remove existing hot applied joint sealant and backer road from concrete joints in accordance with specifications |
$635,894 |
Altus Afb |
OK |
0 |
0 |
| Contract |
Audit for water efficiency, Elemdorf AFB, Alaska |
$217,133 |
Anchorage |
AK |
5 |
0 |
| Contract |
Remove lead paint from hangar door and concrete walls on north end of building. Surface prep and paint metal siding… |
$458,931 |
Anchorage |
AK |
8 |
0 |
| Contract |
'Recovery' Replace roof at Building 1568 |
$162,598 |
Andrews Air Force Base |
MD |
22 |
0 |
| Contract |
'RECOVERY' Replace shingles and plywood roof at Building 3382 |
$45,652 |
Andrews Air Force Base |
MD |
6 |
0 |
| Contract |
'Recovery' Replace entire roof to horizontal shop, building 5026 |
$562,371 |
Andrews Air Force Base |
MD |
10 |
0 |
| Contract |
'Recovery' Replace roof at Hangar 5, Building 1714 |
$78,775 |
Andrews Air Force Base |
MD |
10 |
0 |