| Contract |
Overlay parking lot adjacent to the Eglin BX, Eglin AFB, FL. Mill and overlay the exsiting asphalt,replace concrete curb where… |
$249,188 |
Freeport |
FL |
0 |
-1 |
| Contract |
RECOVERY--FTQW062435-REPLACE WELL PUMP (B1139) |
$98,270 |
Eielson Afb |
AK |
5 |
0 |
| Contract |
Received Mod A00015 on 9/25/09 w/ARRA funds to repair the boiler at the PMEL Building (B4435)at Keesler AFB, MS in… |
$45,073 |
Biloxi |
MS |
0 |
0 |
| Contract |
Repair O'Malley Blvd, Outbound, B2050 to Apollo, Hickam Air Force Base, Hawaii; Repair HMA pavement; New pavement striping |
$273,502 |
Hickam Afb |
HI |
0 |
0 |
| Contract |
Remove existing hot applied joint sealant and backer road from concrete joints in accordance with specifications |
$635,894 |
Altus Afb |
OK |
0 |
0 |
| Contract |
REPAIR FIRE PROTECTION SYSTEMS, BLDG 1168, HICKAM AFB, HI 96853 |
$812,097 |
Hickam Afb |
HI |
3 |
0 |
| Contract |
Repair runway, rubber removal & striping |
$736,112 |
San Antonio |
TX |
10 |
0 |
| Contract |
Replace deteriorated asphalt pavement, Taxiway Bravo Hardstands (S72, S74, S76) AJJY 06-1100 |
$807,000 |
Barrigada |
GU |
20 |
0 |
| Contract |
PAINTING IDIQ/REPAIR AND PAINT EXTERIOR BLDG 7429 ESP:AQ - LACKLAND AFB |
$3,383 |
San Antonio |
TX |
1 |
0 |
| Contract |
Roofing Repairs/Repair Base Chapel Roof Bldg 5701 |
$530,192 |
Oklahoma City |
OK |
0 |
0 |
| Contract |
TAS::57 3404::TAS PAINTING IDIQ/REPAIR AND PAINT INTERIOR STAIRWELLS B/9410 ESP:AQ - LACKLAND AFB |
$18,100 |
San Antonio |
TX |
1 |
0 |
| Contract |
KRSM010170 - Provide Handicap Access Basewide, Hill AFB UT. All materials, labor, and equipment and superivision to provide 15 handicap… |
$40,790 |
Hill Afb |
UT |
5 |
0 |
| Contract |
Provide labor and materials necessary to repair Liberty Drive at Laughlin AFB in accordance with the plans and specifications marked… |
$760,552 |
Laughlin A F B |
TX |
1 |
0 |
| Contract |
Maintain/Paint the Interior of Building 100 |
$20,081 |
Warner Robins |
GA |
4 |
0 |
| Contract |
SCOTT AFB BLDG. 504 ROOFING |
$49,205 |
Scott Air Force Base |
IL |
5 |
1 |
| Contract |
• Remove and construct new handrails at Bldg 300 on the center loading area between the two wings. • New… |
$168,963 |
Warner Robins |
GA |
1 |
0 |
| Contract |
5019 - Sustain Pavements 6th Street/Arnold-Thomas, This project consists of removing existing gravel and asphalt and replacing with new gravel… |
$560,705 |
Little Rock Air Force Base |
AR |
9 |
0 |
| Contract |
Extend the sand filter backwash piping from the lift station #23 to the head of the plant, install new trickling… |
$95,701 |
Warner Robins |
GA |
3 |
0 |
| Contract |
Replace asphalt on Alpha Ramp Shoulder |
$118,000 |
Trenton |
NJ |
1 |
0 |
| Contract |
TAS Recovery Project #: UHHZ070219: RP # Repair/Replace Roof, LOG Facility Dep Operations, Bldg 300, Robins AFB, GA. The purpose… |
$61,504 |
Warner Robins |
GA |
6 |
0 |