U.S. Coast Guard

Below are stimulus contracts, grants and loans awarded and funded by the U.S. Coast Guard.

Awarded

Type Description Amount City State Jobs Vote
Contract Boiler Controls Installation and Testing, Installation Report, and Crew Training $107,072 Honolulu HI 0 0
Contract Boiler Controls Installation and Testing, Installation Report, and Crew Training $89,606 Alameda CA 0 0
Contract Construction New Dual Covered Moorings USCG Station Neah Bay, Washington $2,833,668 Neah Bay WA 0 -1
Contract Award of design build construction of new covered moorings. $2,290,980 Coos Bay OR 0 -1
Contract Note that this is not a federal award contract, grant, or loan; thus the above reporting information section is not… $63,224,645 Burlington IA 22 0
Contract Boiler Controls Installation and Testing, Installation Report, and Crew Training $93,620 San Diego CA 0 0
Contract Type I Refrigeration Plant, Unit Cooler, Box $459,088 Avenel NJ 3 0
Contract Phase I archaeological survey of the right-of-way for an underground waterline that will be installed on Colonial National Historical Park… $49,409 Norfolk VA 0 0
Contract Boiler Controls Installation and Testing, Installation Report, and Crew Training $107,072 Honolulu HI 0 0
Contract Boiler Controls Installation and Testing, Installation Report, and Crew Training $91,410 Seattle WA 0 0
Contract Note that this is not a federally awarded contract, grant, or loan; thus the above reporting information section is not… $67,709,349 Bay Minette AL 20 1

Funded

Type Description Amount City State Jobs Vote
Contract Boiler Controls Installation and Testing, Installation Report, and Crew Training $107,072 Honolulu HI 0 0
Contract Boiler Controls Installation and Testing, Installation Report, and Crew Training $89,606 Alameda CA 0 0
Contract Construction New Dual Covered Moorings USCG Station Neah Bay, Washington $2,833,668 Neah Bay WA 0 -1
Contract Award of design build construction of new covered moorings. $2,290,980 Coos Bay OR 0 -1
Contract Note that this is not a federal award contract, grant, or loan; thus the above reporting information section is not… $63,224,645 Burlington IA 22 0
Contract Boiler Controls Installation and Testing, Installation Report, and Crew Training $93,620 San Diego CA 0 0
Contract Type I Refrigeration Plant, Unit Cooler, Box $459,088 Avenel NJ 3 0
Contract Phase I archaeological survey of the right-of-way for an underground waterline that will be installed on Colonial National Historical Park… $49,409 Norfolk VA 0 0
Contract Boiler Controls Installation and Testing, Installation Report, and Crew Training $107,072 Honolulu HI 0 0
Contract Boiler Controls Installation and Testing, Installation Report, and Crew Training $91,410 Seattle WA 0 0
Contract Note that this is not a federally awarded contract, grant, or loan; thus the above reporting information section is not… $67,709,349 Bay Minette AL 20 1